Foundation Blocks are Set and Stacked

  • Writer: Ralph Hilton
    Ralph Hilton
  • May 16, 2017
  • 1 min read

Updated: Oct 19, 2020

Since last update we have made substantial progress. First, a supply water spigot was trenched and connected in proper position under subfloor. Secondly, we installed an external electrical breakout circuit from our main service panel with a child inline meter. Then we trenched and set 1" PVC conduit from the meter box to a remote RV 50A power receptacle where the PATRIOT III will plug in. Size 8 gauge, (3 wire) with ground cable allows up to 40A, 120 VAC service. External wall tensioned datum lines at the proper set back distance from property lines aided the proper CMU block placement. Grass was removed at block locations and dirt compacted and leveled. Then the blocks were set and stacked to be within 2 1/2" height difference to plumb floor with levelors. All main fabricated parts have been ordered.

 
 
 